TG has worked for TXDOT all along the Texas Coast constructing, maintaining, and repairing different types of fender systems along with the Galveston-Bolivar Ferry Landing. The Ferry Landing…
The improvements to Del Monte were completed through multiple phases of work. Landside improvements included renovations to the existing cold storage facilities and a 450’ truck dock expansion…
Clipper Dock, Boat Ramp, T-Head Texas A&M University at Galveston (TAMUG) is located on Pelican Island along the Galveston Ship Channel. Projects for TAMUG have included, but are…
Rebuild Galveston Base, Coast Guard Sector Field Office The USCG Galveston base is located on Galveston Island at the intersection of the Houston and Galveston Ship Channel. This…
Centered on a 95-acre stretch of waterfront adjacent to the Houston Ship Channel, Industrial Terminals is the largest project cargo port in the United States. The work consisted…
409 LF of new sheet pile wall was driven for Landry’s waterfront restaurant: Fisherman’s Wharf(Located in Galveston, Tx). Multiple storm drain outfalls were exiting through the existing sheets...
Repairs were made to Galveston Terminal’s Barge Fuel Dock damaged during operations. Pipepiles were pulled and replaced with a 36” diameter x 80’ long steel pipe. Existing deck was removed...
The scope of work covered a multitude of different items. Some of which included: removal,repair and resetting of landing ramps, pouring new stem walls, fabricating and installing...
Located next to the Galveston Ferry Landings, the reconstruction of TxDOT’s Work Docks consisted of full removal and replacement of four existing berthings and the addition of one new slip...
Due to Damage from Hurricane Harvey, Argos’ existing wooden dock at the Port of Houston had to be removed. After demolition, a new sheet pile wall was driven with a concrete cap formed...
The USCG extended the existing South pier an additional 150 feet long x 40 feet wide to accommodate the arrival of two new fast response vessels. In addition to the pier extension, the granite...
This project consisted of removal and replacement of an existing railroad bridge fender system. Work was done while the railroad bridge remained operational. TG fabricated a new steel fender...
Project consisted of demolition/ removal of existing deck sections, removal and replacement of existing concrete piling, concrete spall repair, stem wall/ bent cap repair, forming and pouring back new...