GALVESTON TERMINALS

Location

Galveston, TX

Owner

Galveston Terminals

Engineer

Lanier

Repairs were made to Galveston Terminal’s Barge Fuel Dock damaged during operations. Pipe piles were pulled and replaced with a 36” diameter x 80’ long steel pipe. Existing deck was removed in order to pull damaged vertical / batter piles and reweld broken connections. New fabricated galvanized grate frame / grating was installed. Existing fuel pipes mounted along the dock had to be removed and replaced to complete repairs.