Galveston TX
Landry’s
Stanley Spurling & Hamilton, Inc.
409 LF of new sheet pile wall was driven for Landry’s waterfront restaurant: Fisherman’s Wharf (Located in Galveston, Tx). Multiple storm drain outfalls were exiting through the existing sheets that required installation of a cofferdam to pump down water levels and complete the work. The drainage culverts, one 48” box culvert and one 72” RCP, were extended through the new sheet pile wall. The existing concrete cap was chipped back and doweled into a new cap formed and poured in place over the sheets.
Galveston TX
Landry’s
Stanley Spurling & Hamilton, Inc.