The scope of work covered a multitude of different items. Some of which included: removal, repair and resetting of landing ramps, pouring new stem walls, fabricating and installing hinges and field welding new ramp shoes/ brace plates to the landings. In addition to landing ramp work TG also pulled and drove new 23 pile clusters as well as straightened / re-wrapped selected existing clusters used as a fendering system for the landings. All work had to be in coordination with TxDOT Ferry operations to allow boats to remain in operation during construction.